Execution & Design Strategies – to improve schedules and productivity
- What can we do with the design early, so you can start construction earlier
- How can we streamline that process to get to the field earlier
- Prefabrication and assembly – what are the capabilities to do key tasks offsite in advance to help improve productivity and mitigate labor shortages
- How can we do more with less?
- Are digital twins helping and how can EPCs handover digital twins to the Owner in a manner to where they are useful during the operating life-cycle
- How are drones being used to monitor/measure progress and work front availability
- What are the benefits of digitizing engineering and vendor data to improve access to field construction personnel
- How can regulatory process improve to allow for early activities to begin w/o final design of some elements of the facility
PANEL MEMBERS
- Mona Setoodeh, President, CH-IV
- Sam Abdalla, CEO, Nebula Energy
- Peter Zhang, Sr Principal LNG Consultant, Gulf LNG Solutions
- Bronson Burke, Executive Director – Engineering & Construction, Bron & Claude
- Steve Borsos, Vice President – LNG, Fluor Corporation
- Moderator: Steve Cabano, President, Pathfinder LLC